Engineering review
Drawings, interfaces, access, materials and fabrication details are reviewed before production release.
Jaroonrat combines an ISO 9001:2015 management system with experienced engineering, certified welding personnel and in-house finishing capability.
SGS certificate TH25/0000153 covers the design, manufacturing, installation and maintenance of machinery for the painting and coating industry. The document states 10 February 2025–9 February 2028, subject to satisfactory surveillance audits.
The displayed certificate appendix lists the former factory address. An updated document will be provided after the next audit. Please contact us for certification documentation for your project.
Project-specific inspection and documentation requirements are agreed during engineering and production planning.
Drawings, interfaces, access, materials and fabrication details are reviewed before production release.
Qualified personnel perform welding for project materials and requirements, supported by visual and dimensional inspection.
Surface preparation and industrial coating can be coordinated with fabrication schedules and delivery requirements.
Inspection points, testing and handover records are prepared to suit the agreed project scope.

Factory capability creates confidence, but completed projects show how that capability performs. Review both before discussing your next requirement.